WCD Freezer Phase 2
WCD Freezer Phase 2 is a refrigerated warehouse improvement project located in San Bernardino, CA, supporting large-scale cold storage and food distribution operations within an active industrial facility.
Scope of work included electrical infrastructure upgrades and phased improvements for expanded freezer warehouse operations, including new power distribution equipment, panelboards, MCC coordination, warehouse lighting, battery charging systems, heat trace systems, motorized door power, refrigeration equipment connections, engine room electrical systems, and branch power distribution throughout the facility.
The project also included electrical systems supporting material-handling equipment, cold storage operations, and temperature-controlled warehouse environments, designed to maintain operational reliability in an active distribution setting.
LOCATION: San Bernardino, CA
INDUSTRY: Industrial
SERVICE: Design/Build, Tenant Improvement
GENERAL CONTRACTOR: KPRS Construction Services